Hotline
+86 13917826292
Public
Public
Mobile
Mobile website
osmanuv@hotmail.com
At present, the tested drying systems are running well and stably, and the temperature curve is smooth and continuous, which fully meets the requirements of the current production capacity of the Dongguan coating production line and can meet the requirements of increasing production capacity in the future
Dongguan coating production line is mainly composed of pre-treatment electrophoresis line, sealed bottom coating line, intermediate coating line, top coating line, finishing line and its drying system.
Painting production line engineering process layout:
1. Plastic spraying line: upper conveyor chain-spraying-drying (10min, 180℃-220℃)-cooling-lower part
2. Painting line: upper conveyor chain-electrostatic dust removal-primer-leveling-top coat-leveling-drying (30min, 80℃)-cooling-next part
Paint spraying mainly includes oil shower spray booths and water curtain spray booths, which are widely used in the surface coating of bicycles, automobile leaf springs, and large loaders.
Oven is one of the important equipment in the coating production line, and its temperature uniformity is an important index to ensure the quality of the coating. The heating methods of the oven include: radiation, hot air circulation and radiation + hot air circulation, etc. According to the production program, it can be divided into single room and through type, etc. The equipment forms include straight-through type and bridge type.
E-mail:osmanuv@hotmail.com
No. 28, Second Industrial Zone, Liuyongwei, Wanjiang
District, Dongguan City, Guangdong Province